System testing is carried out at various points during the assembly process. In addition, our in-house testing and control department carries out extensive system acceptance testing (SAT) prior to system shipment. Furthermore, during the factory acceptance test (FAT) pre-validation of the system is carried out to ensure quick and easy system validation.